A grid-scale Battery Energy Storage System (BESS) at Coalburn, delivered for Copenhagen Infrastructure as Senior Site Manager and client-side agent for Wood Plc. Currently in the mobilisation phase, with site management of the principal contractor's build through to energisation.
Forms part of an ongoing programme of renewable-energy delivery — alongside completed BESS sites including Braco (10MW), Orchard Bank (10MW), Cedar (28MW) and Loudwater (40MW), built with Canadian Solar, Noah and Catel.